Skip to product information
1 of 9

The Trendy Tailz

Dog Leash Reflective Long Lead Training Tracking Line

Dog Leash Reflective Long Lead Training Tracking Line

Regular price $48.99 USD
Regular price $0.00 USD Sale price $48.99 USD
Sale Sold out
Shipping calculated at checkout.
Color
Size
Quantity

SPECIFICATIONS

Dog Leash Type: Basic Leashes

Feature: Reflective

Lifestage: All stages

Material: Nylon

Pattern Type: Solid

Season: all seasons

Type: Leashes, Dogs

Customized: Yes

 

Dog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs

Foam Handle

Description
A dog lead is used for no pull to ensure safety,for improving our experience walking with our pets. It can be used further for training purpose to train your dog recall,for off leash training and other obedience skills. JANPET long leash is a perfect choice for training and exercise your dogs. Our long lead check cord is made with high-durability rope,gentle on hand,with a heavy duty swivel hook and a soft padded handle for ultimate comfort,very suitable for in-field or at home training as daily walking,camping,hiking,swimming,beach,backyard playing with tennis balls.

Main Feature:
1, nylon durable
2. Outdoor tracking leash, suitable for training, climbing, hiking
3. reflective, safe to travel at night or in bad light
4, the hook can withstand 100 kg pulling force
5 , Comfortable foam padded handle

size reference :
S: Leash Length 2m, diameter 0.8cm/0.31"
M: Leash Length 3m, diameter 0.8cm/0.31"
L: Leash Length 5m, diameter 0.8cm/0.31"
XL: Leash Length 10m, diameter 0.8cm/0.31"
XXL:Leash Length 15m, diameter 0.8cm/0.31"
XXXL:Leash Length 20m, diameter 0.8cm/0.31"


View full details